Us holding are keys that are no longer for our house since we changed the locks as one of the first things. Here is a list of things we are working on:
Project 1
Install Sub panel
Change Locks
Run Wire Put in outlet for dishwasher
Install new side door
Install Dishwasher
Change Bed #2 Door
Install Garbage Disposal Change downstairs door
Install new garage door
Install new garage door
Project 3 & Project 4
Repair roof shingles
Clean gutters
Replace OD Jack
Re-attach gutters
Put lattice on deck
Put handrail down stairs
Project 5 & Project 6
Put in new shower faucet
Take out knotty pine paneling in kitchen
Put GFCI outlets in bathroom
install cabinets in kitchen (part 1 of 5)
Put GFCI outlets in kitchen
install counter in kitchen (part 1 of 5)
Put in fan in Master Bath
Put up dry wall in kitchen
Put up molding and paint
Project 7& Project 8
Install smoke detectors
Paint inside of house
Hang up fire extins.
Deodorize downstairs (ferrets and dog)
That's all for about now. (When I went to post this all got mashed together)
No comments:
Post a Comment