Monday, September 21, 2009

Us Signing Papers

Our awesome Realtor Millie Knight. I would totally recommend her! Warning! long list below!
Us holding are keys that are no longer for our house since we changed the locks as one of the first things. Here is a list of things we are working on:
Project 1
Install Sub panel
Change Locks
Run Wire Put in outlet for dishwasher
Install new side door
Install Dishwasher
Change Bed #2 Door
Install Garbage Disposal Change downstairs door
Install new garage door
Project 3 & Project 4
Repair roof shingles
Clean gutters
Replace OD Jack
Re-attach gutters
Put lattice on deck
Put handrail down stairs
Project 5 & Project 6
Put in new shower faucet
Take out knotty pine paneling in kitchen
Put GFCI outlets in bathroom
install cabinets in kitchen (part 1 of 5)
Put GFCI outlets in kitchen
install counter in kitchen (part 1 of 5)
Put in fan in Master Bath
Put up dry wall in kitchen
Put up molding and paint
Project 7& Project 8
Install smoke detectors
Paint inside of house
Hang up fire extins.
Deodorize downstairs (ferrets and dog)
That's all for about now. (When I went to post this all got mashed together)